A two-storey home Bearer & Joist finished in Carlingford: pale brick below, timber-look cladding above, a dark metal roof and new turf in front.
Builders in Carlingford NSW

Stay in the street you love, in a house that finally fits.

4.968 Google reviews, rated 4.9 out of 5
  • Fixed price, every allowance listed
  • Theo, the owner, runs every site
  • Home building cover before any deposit

What are you planning?

Call Theo (02) 5550 0148

NSW contractor licence 555021C, general building work. Licensee Bearer & Joist Building Co Pty Ltd.

Homes we’ve built nearby

One Carlingford rebuild, photographed from the same spot at every stage. Tap through it.

The block before work started: a small 1960s fibro cottage behind an overgrown front yard. The cleared block with string lines stretched between timber profile boards, marking the new home's corners. The new two-storey timber frame standing on the slab, from the same spot on the footpath. The finished home at handover, from the same spot on the footpath.

Knockdown rebuild, Carlingford

The family had lived here 20 years and didn’t want to leave the street. The old cottage had asbestos sheeting, so a licensed removalist took it out before demolition.

Scope
Two storeys, four bedrooms, a study and a double garage
Design
The owners’ building designer
On site
13 months from demolition to handover

More recent jobs

A new flat-roofed living room with its sliding doors open to a timber deck, lit up at dusk behind a 1960s brick house.
Rear extension

Beecroft

Kitchen, living and a deck across the back of a 1960s brick house. The family lived in the front rooms throughout. 7 months on site.

A 1970s cream brick house with a new weatherboard second storey and a low metal roof.
Second storey

North Rocks

Three bedrooms and a bathroom upstairs, the original brick ground floor kept. Plans by the owners’ architect. 9 months on site.

A renovated open kitchen and living room with a long island bench, green joinery and a skylight.
Renovation

Eastwood

The back half of a 1950s house opened up into one kitchen and living room, with a skylight over the bench. 5 months on site.

A long, low dark brick home with deep eaves and a sandstone step, set into a native garden.
New home

West Pennant Hills

A single-storey home stepped down the owners’ sloping block, with our building designer. 12 months on site.

Swipe for more. Every home is shown with the owners’ permission.

What our clients say on Google

4.9

68 reviews on Google, rated 4.9 out of 5

Dimitra K.Carlingford

Knocked down mum’s old place and built for the five of us. Theo was there most mornings and Anjali sent photos every Friday so we always knew where it was up to. We hit rock in the back corner, it was priced and signed off before they touched it. Would use them again

Knockdown rebuild

Rohan S.North Rocks

Second storey on our 70s brick house. Approval took longer than we hoped but they told us early, and once they started the build ran pretty close to the program. Site was kept tidy which mattered with two little kids.

Second storey addition

Megan W.Beecroft

Picked them over two cheaper quotes. Theirs listed every allowance, the others were missing things we only found out about later. There was dust of course but they sealed off the front of the house well.

Rear extension

How our price is built

Every home is different, so there’s no price list here. What there is: the same six parts in every quote we write, so you can compare ours with anyone’s.

Your fixed price quotesix parts
Inclusions
Everything we’re building, room by room, down to the doors, tiles and tapware.
Exclusions
What isn’t in the price, written down, so nothing turns up later as a surprise.
Prime cost items
Things you haven’t chosen yet, like the oven or the basins, with a realistic amount allowed for each.
Provisional sums
Work nobody can price exactly until it starts, like rock under the slab. An honest estimate, never a low one.
Site costs
Demolition, asbestos removal by a licensed removalist, the crane, temporary fencing and connections.
Variations
If you change something, or the ground does, we price it and you sign it before the work is done.

Why we don’t quote per square metre

A per square metre rate leaves out the slope, the soil, the demolition and your selections, and those are what move the price. We’d rather give you a real range after we’ve seen your block.

How a job runs

Six stages, the same on every job. You’ll know who you’re dealing with at each one.

  1. First meeting on site

    With Theo, at your place

    About an hour. We walk the block, talk through what you want and roughly what you want to spend.

  2. Preliminary estimate

    With Theo

    A written range from your sketches or plans, with what it’s based on. If it doesn’t fit, we say so now.

  3. Design and approvals

    Your architect or our building designer

    A development application through council, or a complying development certificate through a private certifier. We coordinate both.

  4. Fixed price contract

    With Theo and Anjali

    Your selections are made, the quote is itemised and the contract signed. Your home building compensation certificate comes before any deposit.

  5. The build

    Theo on site, Anjali in the office

    A photo report every Friday. Progress claims follow the stages, once each is done:

    BaseclaimFrameclaimLock-upclaimFixingclaim

    Most rebuilds pay through a construction loan, so the bank inspects each stage before it pays.

  6. Handover

    With Theo, room by room

    A final walk-through at practical completion, a list of anything to fix, and one number to call for as long as the warranty runs.

Who you’ll deal with

Two people, from the first meeting to handover. No sales team.

Theo Karamanos in a white hard hat and hi-vis shirt, measuring a stud inside a timber frame.
Theo at frame stage on a rebuild in Epping.

Theo Karamanos

Owner and licensed builder

A carpenter by trade, building in the Hills for over 25 years. Theo takes on a few homes at a time so he can be on each site most mornings, and he’s the one who answers the phone.

Anjali Menon and Theo Karamanos going over plans on a site table.

Anjali Menon

Project manager

Your selections, the program, progress claims and the Friday report.

Friday report, as we’d send itWeek 19

This week: roof sheeting finished, windows in on the north side. Lock-up inspection booked for Wednesday.

Your selections due: kitchen benchtop colour, by next Friday.

Licensed and insured

The same details as the sign on our site fences.

Bearer & Joist
Building Co Pty Ltd

Licence
NSW 555021C
Category
General building work
Licensee
Bearer & Joist Building Co Pty Ltd
Phone
(02) 5550 0148

Building an architect’s design

About half our homes start on someone else’s drawings. We’re glad to price yours.

Where we build

Within about half an hour of our office in Carlingford.

Our smallest jobs are single-storey extensions. Somewhere close by that isn’t listed? Ask anyway.

Questions

Do you build in our area, and do jobs our size?

If you’re in one of the suburbs above, yes. We build knockdown rebuilds, new homes, second storeys and extensions. The smallest job we take is a single-storey extension.

Can we get a price before we pay for plans?

Yes. After the first meeting we give you a written preliminary estimate from your sketches or plans, so you know whether the project fits your budget. The fixed price comes once the design and selections are done.

Is the price fixed?

The contract is a fixed price. What can change it is written into it: changes you ask for, things nobody can see until the work starts (like rock or asbestos), and the allowances for things you haven’t chosen yet. Every change is priced and signed by you before the work is done.

How long will it take?

Your contract gives a build time for your home, with what can move it: approvals, wet weather and late selections. The projects above show how long each one took on site.

Can you build our architect’s plans?

Yes. Send the drawings and we’ll price them. Your architect stays involved during the build if you’d like them to.

Who handles approvals and demolition?

We coordinate the approval, a development application through council or a complying development certificate through a private certifier, and the demolition. Asbestos is removed by a licensed removalist.

How do payments work?

A deposit, capped by law and only once your home building compensation certificate is issued, then a progress claim as each stage is finished: base, frame, lock-up, fixing and practical completion. If you have a construction loan, the bank pays each claim after its inspection.

Tell us about your project

Theo will call to book a first meeting at your place. It costs nothing, and you’ll leave it knowing whether we’re the right builder for you.

Office Monday to Friday, 7:30am to 4:30pm

  • Monday7:30am to 4:30pm
  • Tuesday7:30am to 4:30pm
  • Wednesday7:30am to 4:30pm
  • Thursday7:30am to 4:30pm
  • Friday7:30am to 4:30pm
  • SaturdayMeetings by appointment
  • SundayClosed
Bearer & JoistOffice Mon to Fri, 7:30am to 4:30pm

Book a first meeting

Four quick steps. Theo reads every one.

What are you planning?
Where are you up to?